8 english


 
 Project Based Learning
1.Project Plan
(1.1)The Define Phase
(1.11)Introduction:
·   Write a statement describing the overall purpose of the project.
·   What is the key challenge or problem the project is aiming to address?
·   What are students intended to learn from the project?

1. How are we responsible for change in climate?
2.Is change of climate is inevitable?
3. What is climate?
4. What is thedifference between climate and weather?
5. Write the consequences of climatic changes?
6. How will you help to your neighbor, after listening the news of onset of cyclone in your area on TV or radio?




(1.12)Project Scope:
            Describe the scope of your project. This may include class and section, subjects it covers, self shills to be used etc. as well as other factors affecting scope.
VIII English Chapter 8 Monsoon Diary
Exploration of environment and find out the different patterns.
Student’s research will be monitored.




(1.13) Curriculum and Standards:
            List the curriculum and standards this project with cover.
VIII English Chapter 8 Monsoon Diary







Project Based Learning
Lesson 2
2.1 Essential Question:
            Put in writing the question that will engage the students
1. How are we responsible for change in climate?
2. Is change of climate is inevitable?
2.2 Grouping Strategy:
            Describe the criteria that will be used to form students team and how this maps to the goals of the project.
Team will comprise groups of 11 students of mixed gender, and mixed ability and skills. One of the goals is to promote teamwork in mixed ability groups so that higher ability students get opportunities for peer instruction, and lower ability students benefit from the more advanced collaboration that will arise from this.

2.3 Learning Environment:
            Describe the learning environment for the project including any classroom adaptation that will be required.
A group working area in the classroom will be set aside with tables and chairs to allow more effective interaction among team members. A classroom wall near the project area will be set aside to post paper materials collected during research. Computer labs will be used for the majority of the online work. Research notes will be recorded in computers/blogs. Some collaboration between students will take place through email/whats’app.

2.4Assessment Approach:
                Describe the approach for:
                2.41 Authentic Assessment:
           
           
2.42 Formative Assessment:
           
Regular feedback will be provided as the students work on internet and library research, surveys, date  sheets, and presentation designs.       

2.43 Summative Assessment:
Assessment will be conducted on
·         Team  portfolios in blogs/emails
PowerPoint presentation on a balanced diet/web design         

2.44 Rubrics:
Assessment will be conducted on
·         Team  portfolios in blogs/emails
PowerPoint presentation on conservation of environment and controlling pollution/web design   


2.45 Gradings:
Project grades will be based on a combination of scores from assessments made during the project. A rubric will be used to compile grades.          





Project Based Learning
Lesson 3- Plan Phase
3.1 Work Breakdown, Products and Milestones:
            List the project task and, if possible at this stage include the sub-tasks. For each task add the product that will be created and indicate it will be a milestone.
Activity: 1. Evaluation of changes in climate
2. Preparation of strategies to combat with reverse climatic changes.
 3. To aware the society, to play the role of a responsible citizen
 4. Factors which affects the weather and climate.
5. Development of analytical and scientific skills Research: Online and using books
Presentation: Ppt of climate ad effect of climate changes
Celebration: Mini exhibition on different climates
3.2 Role definitions:
            List the roles team members will fulfill in the project.
Project leader: Teacher
Researcher : One student
Survey writer : One student
Presentation : Group leaders
3.3 Task schedule:
            Note start and end dates for the project.
                Include expected dates to start specific tasks
Start date : Nov 1st 2016
End date : Dec 15th 2016

3.4Special Activities Plan:
                List any special activities (e.g. Field trips or guest speakers) including dates.

Mini exhibition: Dec 15th 2016

            3.5Resources Plan:
List resources that will be required during the project and any other date constraints associated with them.
Computer, library
3.6 Direct Instruction:
List any planned direct instruction sessions and link them to specific tasks if appropriate.
Different climates
Exploring the environment

3.7 Reviews and checkpoints:
                Describe how you will incorporate review meetings and checkpoints in the project
At the end of every week there will be discussion for 10 minutes.

3.8 Assessment plan:
            Describe the balanced assessment plan for the project. List products that will be assessed during the project. List rubrics that need to be created before project launch.
It will include: The survey and results,exploration of environment,ppt,analyzing climate changes.
Rubrics for the above will be prepared accordingly.







LESSON -4
WORK PLAN

Sl.
No
TASK
SUBTASK
ROLE
START DATE
END DATE
PRODUCT
01
Launch project


01.11.16

01.11.16
Project launched
02
Deliver classroom instruction
Areas to be covered.
1.climate changes
2.Other effects

Teacher
02.11.16
02.11. 16
Initial classroom instruction is completed
03
Group selection
Group leaders
1.      Niranjan prakash
2.      J pranav
3.      Avinash
4.      Abhinav
5.      Abhishek
6.      Adwaith L A
7.      Rahul Manohar

Teacher
03.11.16
03.11. 16
Group selection is completed
04
Conduct research
1.Evaluation of changes in climate
2. Preparation of strategies to combat with reverse climatic changes.
3. To aware the society, to play the role of a responsible citizen 4. Factors which affects the weather and climate.
 5. Development of analytical and scientific skills Behavioral outcomes
Student
04.11. 16
10.11. 16
Students recorded in the computer
05
Perform survey
Exploration of environment and preparing a report
Student
11.11. 16
20.11. 16
Collected report
06
Programme sheet activity
1.      Relation between Fibonacci sequence and golden ratio
2.      Geometric progression
3.      Harmonic progression
Student and teacher
21.11. 16
28.11. 16
Prepared
07
Advice meeting
Team prepare briefs
All team members
29.11. 16
29.11. 16
A meeting was held
08
Programme sheet presentation
Presentation
,,
30.11. 16
30.11. 16
Presented
09
Preparation of questionnaire
Eliciting from peer group and self analization
Each member
01.12. 16
01.12. 16
Prepared questions
10
Lecture by specialist
Mrs.Bindu PGT Biology on climate changes and its effect
Teacher
02.12. 16
02.12.16
Completed
11
Exhibition
Practice presentation
All members
03.12. 16
03.12. 16
Completed
12
Project presentation
Posting in the computer/blog
All
05.12. 16
05.12. 16
Completed
13
Assessment and grading
Prepare rubrics and assessment
Teacher
05.12. 16
05.12. 16
Completed
14
Reflection and evaluation
Student reflection and evaluation,Teacher refection and evaluation
Students and teacher
05.12. 16
05.12. 16
Completed.
15
Project closed
Submitting to the Principal
Teacher
15.12. 16

Closed




Lesson 5

The Do Phase

(5.1) Project Launch:
                Describe how the project will be launched, including how goals, expectation, rules, procedures, assessment, and grading will be presented to the students.
The project will be launched in class VIII C.
A briefing will be given about the survey to be undertaken, how to go about the research work ,tips on how to make a PowerPoint presentation etc. Students opinion and how best they can contribute will be discussed

(5.2) Artifacts:
                List artifacts that will be created during the project
Research notes
Survey reports
Presentation

(5.3) Culminating product:
                Describe what culminating product or products are expected to be created during the project and how they will be presented.
Ppt – Sequences
Chart- Effect of weather and climate change.
Report of the exploration work done in the environment

(5.4) Celebrating completion:
                Describe how the students will celebrate when the project is completed.




A “mini exhibition” of the project will be done in the class.




Lesson 6

The Review Phase

 (6.1)Student Reflection and Evaluation:
                Describe how student reflection and evaluation will be conducted.
For students reflection the lesson I will take up in the Do phase
Each student will write about the topics he got, new information gained, new skills learnt, what they liked about the project and what they did not like. They will go through the ppt, survey report, different activities and information collected by the students before writing down the reflection.


(6.2) Teacher Reflection and Evaluation:
                Describe how teacher reflection and evaluation will be conducted.
  • Successes- I will consider the PBL successful if most of the children are able to understand the different sequences we come across and are able to identify Arithmetic sequences from them.
  • Challenges-To make each student contribute some work for the group will be a real challenge. Guiding them at every step will be also a challenge.
  • Achievement – My goal will be achieved if I am able to overcome the above mentioned challenge
  • What I learnt- Some difficult concepts can be learnt with team work.

(6.3) Assessment of 21st Century skills:
                List of 21st century skills in this project and its assessment
Artifact
21st Century skill(s)
Research notes
Problem solving, initiative, ICT
Survey designs
Creativity, problem solving, communication
Message boards
ICT, communication, teamwork
Presentation outlines
Initiative, creativity, ICT, communication

    (6.4) Summative Assessment and Grading:
                List products and the corresponding rubrics that will be used for SA and Grading




Product
Rubric
Grading
Survey results
Survey questions and results rubric

Activity sheets
Activity sheet rubrics

Presentation
Presentation rubric

Blog portfolio
Blog rubric




Lesson 7

The Manage Phase


(7.1) Process Management:
                List tasks that will be used to manage the process of conducting the learning
Brief introduction : Different types of sequences
Each group will be given a sub topic to work upon
The process of the students will be monitored weekly followed by a discussion

(7.2) Student Preparation:
                Describe how students will be prepared for the project prior to launch. List any specific instruction or tasks that will be needed
The students will be told about the idea for the project 2 weeks before it starts. How to use ICT tools to be used during the project (i.e. using a spreadsheet for survey results) will be practiced before the project launch.

(7.3)  Facilitation:
                Describe how facilitation of resources will be used to enable the students to be successful.
Use of the library and computer equipment will be scheduled and booked in advance.

(7.4) Progress Monitoring:
                Describe how program will be monitored throughout the project.
Whole class conference once per week

Group Progress

Team checkpoint meetings as well informally daily checking with teams and individuals on their work.

         Individual    Progress
(7.5) Re-planning:
                Describe how‘re-planning’ will be used if the project goes off track
Since student autonomy is low there is low risk of the project going off track. 10% additional time allowance has been included for overrun but the end date cannot be exceeded. There is an option for homework to be used to catch up if necessary.

(7.6) Conflict Management:
                Describe how to address problems related to participation, offer approaches to manage other conflicts that may arise.
Teamwork rules will be included in project launch presentation. Students are asked to initially try to work out conflicts on their own. In the case of a deadlock, issues are to be raised with the teacher. Lack of participation will be dealt with by culprits being removed from the project work and set to work on alternative individual tasks for the duration of the project.





Image result for monsoon  Image result for climate change


Image result for climate changeImage result for climate change











































































































































0 comments :

Post a Comment

Translate

PHOTOS OF VISITING TRIBAL COLONY

PHOTOS OF VISITING TRIBAL COLONY
CONDUCTING INTERVIEW

INTERACTING WITH TRIBALS

INTERACTING WITH TRIBALS

MEASURING HB

MEASURING HB

MEASURING BMI

MEASURING BMI

Recent Posts

Pages

Copy right: Principal KV No.1 Calicut. Powered by Blogger.

Copyright © Project Based Learning @ KV No.1 Calicut | Powered by Blogger Design by PWT | Blogger Theme by NewBloggerThemes.com | Distributed By Blogger Templates20